Fleet depots
Delivery, HVAC, plumbing, last-mile and service vans that sit overnight. Depot electricity runs roughly $0.04/mile against $0.18/mile for diesel - the fleet is bleeding margin at every gas stop and public charger.
Depot, workplace, property and customer-facing charging, engineered around your electrical service, dwell times, and the incentives your site qualifies for.
Quick answer
Generac, by 02 Energy designs and installs commercial EV charging across New Jersey - fleet depots, workplace and multifamily charging banks, and customer-facing stations for retail, hospitality and municipal sites. Projects are engineered in-house through CPI, sized with a real load study, and quoted with NJ utility make-ready programs and accelerated depreciation modeled into the price. Site walkthroughs are free and every proposal is written.
Chargers are the visible 20 percent. The other 80 percent is service capacity, load management, trenching and conduit, utility coordination, and the incentive paperwork that can move a project's net cost by tens of thousands of dollars. Operators who buy hardware first and think about electrical second end up paying for the project twice.
We run it in the right order: load study first, incentive stack second, hardware specified last. New Jersey is one of the better states to do this in right now - port-and-turnpike logistics density, clean-fleet rules pushing electrification, and a utility make-ready stack that keeps paying out long after any one federal credit window closes.
Different buyers, different reasons to charge on-site - the load study, incentive modeling and build process are the same for all six.
Delivery, HVAC, plumbing, last-mile and service vans that sit overnight. Depot electricity runs roughly $0.04/mile against $0.18/mile for diesel - the fleet is bleeding margin at every gas stop and public charger.
Apartments, HOAs and retail centers where charging is now part of the tenant and guest experience. A parking lot without charging is a property that is starting to look dated to the next lease-up.
C-stores, hotels and shopping centers that can turn a parking lot into a revenue line - paid charging plus longer dwell time and higher in-store or on-property spend.
Employee and visitor charging that has moved from perk to expectation. Facilities without it are already behind on talent attraction and sustainability reporting.
First-aid squads, public works fleets and transit operators running grant-funded projects. We know the procurement process and the paperwork that comes with public money.
High-traffic sites that want DC fast charging as a standalone destination, not just an amenity. We size the hub to your traffic pattern and your grid capacity, not a catalog spec sheet.
Fuel and downtime are the two numbers that move a payback model the most, and both favor depot charging once the electrical work is done right.
Depot electricity runs roughly $0.04/mile against roughly $0.18/mile for diesel. On a 10-vehicle fleet running 25,000 miles a year, that gap works out to roughly $350,000 in fuel savings over ten years, before maintenance or incentives.
Fewer moving parts means fewer oil changes, belts and exhaust repairs. Fleets that switch typically see maintenance spend drop by around 40 percent per vehicle, on top of the fuel savings.
Vehicles waiting at public chargers lose 35 to 60 minutes a day each - four to five hours a week per vehicle. Across a 10-vehicle fleet that is close to a full-time salary in paid time nobody is driving.
The Section 30C federal credit windows have moved and tightened. We do not sell projects on a credit that may not be available by the time you build. These are the levers that hold up regardless.
Engineers meter your service, map dwell times, and define how many ports you need now versus at buildout - free, no obligation.
Cost per mile, downtime savings, and the utility, state and depreciation stack modeled into one document - the real net cost, on paper, before you spend a dollar.
Service upgrades, trenching, switchgear and charger installation - one team, one schedule, one point of contact.
Network activation, driver or tenant onboarding, monitoring, scheduled maintenance and a 24-hour commercial line.
It comes down to dwell time. Vehicles that sit overnight or through a shift are usually best served by managed Level 2 - dramatically cheaper per port and easier on your electrical service. Vehicles that turn around mid-shift may justify DC fast charging at a fraction of the ports. The load study answers it with numbers, not opinions.
Level 2 commercial ports typically run a few thousand dollars each once hardware, labor and electrical work are included. DC fast charging ports cost significantly more and scale with power output. Every site is different once panel capacity, trenching distance and utility coordination are factored in - the site walkthrough produces a written proposal with the real number.
We start with your actual fuel or public-charging cost per mile, model what depot charging costs on your rate schedule, and lay out the savings month by month against the install cost. You see the breakeven point before you commit to anything - it is a spreadsheet built on your numbers, not a generic estimate.
The durable money now runs through NJ utility make-ready programs, which can cover a meaningful share of the utility-side infrastructure, plus accelerated depreciation (MACRS and bonus depreciation) that shifts the effective cost down further. If a state program applies to your site we build it into the proposal. Some projects that broke ground under prior federal credit windows may still have eligibility to sort out with your tax advisor - we flag it, they confirm it.
Often the service needs help - that is normal, and it is exactly the work we do. Load management software can stretch existing capacity across more ports than the panel would suggest. When an upgrade is genuinely needed, we handle the utility coordination end to end so it is one project, not three vendors.
Yes. Multi-site operators get standardized equipment, one point of contact, and one contract across New Jersey and Pennsylvania, instead of a different vendor per address.
Yes. Networked chargers are monitored, maintenance is scheduled, and our 24-hour commercial line covers emergencies. If a port goes down, you get a ticket and a technician, not a support queue.
It is free. An engineer walks the site, meters your electrical service, maps vehicle or visitor dwell times, and leaves you with a written proposal that includes scope, price, and the incentives your site qualifies for. No pressure to sign before you have the number in hand.
Very happy with O2 Energy with the install of our whole-house generator and ChargePoint Level 2 charger! From start to finish, from the sales team and installers, everything was professional.
- Jo Ann T., whole-home generator + EV charger
Team was very professional and completed the work within two weeks. Even though the installation took longer than expected, they kept me informed throughout the process.
- Steven P., generator installation
Very responsive and professional team at O2 Energy. Work was performed timely and with care and skill for my panel upgrade and EV install. I highly recommend this company.
- Joseph G., panel upgrade + EV charger
Very professional service. Great communication, clean installation, and everything works perfectly. I would definitely recommend them.
- Victor H., generator installation
They installed our 26 kW Generac generator. Professional, on time, and neat work. A very satisfied customer and family - thank you for the peace of mind.
- J. Patel, New Brunswick, NJ
Had a Tesla wall connector installed by 02 Energy. Great guys. Fast, neat work and passed inspection. Recommended.
- Camren, EV charger install
Factory-trained crews installing the most trusted standby generator line in America.
Our parent company brings in-house engineering and a project history in the tens of millions.
We pull the permits, schedule the inspections, and keep you updated until the township signs off.
Residential and commercial electrical emergencies answered around the clock, across New Jersey.
Tell us what you need and we'll call you back to schedule a free on-site assessment. Generator, EV charger, panel, or anything electrical.